Federal construction work ranges from small repair jobs at a single base to multi-year building programs, and it comes with rules that commercial construction does not: mandatory bonding, prevailing wages, certified payroll, and formal bid procedures. Finding the bids is the easier part. Knowing which ones you can actually bond, staff, and price correctly is what separates profitable federal work from costly mistakes.
Search by the right codes
NAICS codes
Construction NAICS codes sit in sector 23. The main groups:
| NAICS | Covers |
|---|---|
| 236220 | Commercial and Institutional Building Construction |
| 237xxx | Heavy and civil engineering (utilities, highways, bridges, site work) |
| 238xxx | Specialty trade contractors (electrical, plumbing and HVAC, roofing, concrete, painting, and more) |
Each solicitation is assigned one NAICS code, and that code's size standard determines small-business eligibility. Construction size standards are based on average annual receipts and differ between general and specialty trades, so check the current figures on SBA.gov. Definitions are on the Census Bureau NAICS site (opens in a new tab); see also understanding NAICS codes.
PSC codes
Product and Service Codes for construction generally fall in two families:
- Y: construction of structures and facilities (new work).
- Z: maintenance, repair, or alteration of real property.
Many small-business opportunities are Z-coded repair and alteration jobs. Since the PSC manual is updated periodically, confirm the current codes on Acquisition.gov (opens in a new tab) before relying on them for saved searches.
How construction contracts are awarded
| Method | Where in the FAR | How it works |
|---|---|---|
| Sealed bidding | Part 14 (opens in a new tab) | Invitation for Bids (IFB). Bids are opened publicly; award generally goes to the lowest-priced responsive, responsible bidder. |
| Negotiated | Part 15 | Request for Proposals (RFP). The government evaluates technical approach, past performance, and price, and may hold discussions. |
| Design-build | Part 36 (opens in a new tab), Subpart 36.3 | Often a two-phase process: a short-list based on qualifications, then full proposals from the finalists. |
Sealed bidding is unforgiving. A bid that does not conform to the IFB, such as one missing a required bid guarantee or an amendment acknowledgment, can be rejected as nonresponsive regardless of price. In negotiated procurements, your technical narrative and past performance carry real weight, so a low price alone may not win.
Note that the FAR has been undergoing a significant rewrite. Part and section numbers may shift, so check the version that applies to your solicitation.
Bonding: plan for it before you bid
Miller Act bonds
The Miller Act generally requires performance and payment bonds on federal construction contracts above a dollar threshold set in FAR 28.102 (opens in a new tab). As of this writing that threshold is $150,000, but thresholds are adjusted periodically, so check the current figure. For smaller jobs, the FAR provides for alternative payment protections.
- A performance bond protects the government if you fail to complete the work.
- A payment bond protects your subcontractors and suppliers if you fail to pay them.
Bid guarantees
When performance and payment bonds are required, the solicitation typically also requires a bid guarantee, such as a bid bond, submitted with your bid. The amount is set in the solicitation, often as a percentage of the bid price. A missing or defective bid guarantee is a common reason sealed bids are rejected.
If you are short on bonding capacity
Surety companies set your bonding limits based on your financials, experience, and backlog. The SBA Surety Bond Guarantee program (opens in a new tab) guarantees bonds issued by participating sureties for eligible small businesses, which can help newer contractors get bonded. Talk to a surety agent early; bonding is often the real limit on what you can bid.
Labor standards: Davis-Bacon and certified payroll
The Davis-Bacon Act generally requires contractors and subcontractors on federal construction contracts over $2,000 to pay laborers and mechanics no less than the locally prevailing wages and fringe benefits for their classification. As of this writing, that threshold applies, but confirm current rules with the Department of Labor (opens in a new tab).
What this means for your bid:
- Use the wage determination in the solicitation. Wage determinations are published on SAM.gov (opens in a new tab) and incorporated into the contract. Price your labor using the specific determination and classifications that apply to the project location and type.
- Plan for certified payroll. Contractors generally submit weekly certified payrolls. Make sure your payroll process or software can produce them.
- Flow requirements down. Your subcontractors must comply too, and you are responsible for monitoring it.
Underpricing labor by ignoring the wage determination is one of the fastest ways to lose money on a federal job.
Site visits and pre-bid conferences
Many construction solicitations include a scheduled site visit or pre-bid conference. Attend when you can:
- You see existing conditions that drawings do not capture.
- You hear questions from other contractors, and the answers, which often become amendments.
- Some solicitations make attendance mandatory or strongly expected.
Submit questions in writing by the deadline in the solicitation. Verbal answers at a site visit typically are not binding unless they are issued in a formal amendment.
Who buys federal construction
Construction is purchased across many agencies. Frequent buyers include, for example:
- U.S. Army Corps of Engineers (USACE): military construction, civil works, and support for other agencies.
- Naval Facilities Engineering Systems Command (NAVFAC): Navy and Marine Corps facilities.
- GSA Public Buildings Service (PBS): federal buildings and courthouses.
Many of these agencies also award multiple-award task order contracts (MATOCs) for construction, where only the awardees compete for later task orders. Watching for those base contract solicitations can matter more than chasing individual task orders. Award history on USAspending.gov (opens in a new tab) shows which offices buy in your area and trade.
Set-asides and subcontracting limits
Many construction projects are set aside for small businesses or for 8(a), HUBZone, service-disabled veteran-owned, or women-owned firms. If you win a set-aside, limitations on subcontracting apply. The FAR sets different limits for general construction and special trade contractors, measured by the amount paid to subcontractors that are not similarly situated. Read the clause in your solicitation and confirm the current percentages before you plan to subcontract most of the work. When in doubt, ask the contracting officer or a qualified advisor.
Next steps
- Browse open federal opportunities and filter by NAICS 236, 237, and 238.
- See which agencies buy construction, the set-asides they use and current open notices in federal contracts for construction companies.
- Make sure your SAM.gov record is active first: see registering for federal contracting.
- Read IFBs and RFPs carefully with how to read a solicitation.
- Government Bid Finder's bid matching can flag construction notices that fit your trade and location; always verify bonding, wage, and site visit requirements in the official solicitation.