Pricing is where many first federal bids go wrong: either too high to compete or so low the contract loses money. Federal pricing follows the same business logic as commercial pricing, with a few extra rules. This guide walks through a method for a first bid. It is general information, not accounting or legal advice.
Step 1: read how price will be evaluated
The solicitation tells you how price counts. Look in the evaluation section (often Section M) or the evaluation paragraph of an RFQ.
- Lowest price technically acceptable (LPTA). The award goes to the lowest-priced offer that meets the minimum technical standards. Extra quality earns nothing (FAR 15.101 (opens in a new tab)).
- Best value tradeoff. The agency may pay more for a better technical approach or stronger past performance. The solicitation says whether technical factors are more, equally or less important than price.
- Sealed bidding. Common in construction: lowest responsive bid from a responsible bidder wins.
- Simplified acquisitions. For buys up to the simplified acquisition threshold, generally $350,000 (FAR 2.101 (opens in a new tab)), evaluation is often simpler and price-driven.
If price dominates, sharpen your costs. If technical factors dominate, you have room to price a stronger solution.
Step 2: understand the contract type
- Firm-fixed-price (FFP): you get the agreed price regardless of your actual costs. Most common for small businesses and commercial work. All cost risk is yours.
- Time-and-materials or labour-hour: you bill fixed hourly rates for hours worked, plus materials at cost. Your rates must cover wages, overhead and profit.
- Cost-reimbursement: you are paid allowable costs plus a fee. Requires an accounting system the government accepts; rare for first contracts.
Also check the period of performance. Many service contracts have a base year and several option years. Your price for each option year needs to cover expected wage and cost increases, because you are bound if the government exercises the option.
Step 3: build your costs up
Start from the statement of work, not from a number you hope will win.
- List every task and deliverable. Use the performance work statement's own structure.
- Estimate the labour: hours per task, by labour category. For recurring services, staff the post or the schedule the work requires.
- Apply wage rates. For services and construction, check the wage determination (below).
- Add fringe benefits and payroll taxes.
- Add other direct costs: materials, equipment, travel, subcontractors, insurance or bonds the contract requires.
- Add overhead and general and administrative costs at rates your business actually incurs.
- Add profit.
Write down your assumptions. If you need to adjust later, you will know what moved.
Step 4: include wage determinations
For many service contracts, the Service Contract Labor Standards set minimum wages and fringe benefits for each labour category in the area. For construction, Davis-Bacon wage rates apply above a small threshold. The applicable wage determination is attached to the solicitation and searchable on SAM.gov (opens in a new tab). You must pay at least those rates, so first-time bidders who price from their commercial wages are sometimes caught out. Executive orders on federal contractor minimum wages may also apply; check the clauses in the solicitation.
Step 5: research what the work has cost before
You are allowed, and expected, to research the market.
- USAspending.gov (opens in a new tab): filter by agency, NAICS code and keywords to see award amounts for similar work, and whether the current contract is a recompete.
- SAM.gov award notices: recent winners and amounts.
- Our pages: agency pages and NAICS pages show recent awards and top recipients; our industry guides show how awards were made in each field.
- The incumbent's contract: if the work is a recompete, the previous award often shows the price level. See how to find recompetes.
Be careful comparing totals: scope, length, option years and location change everything. Use past awards as a sanity check on your build-up, not as a target.
Step 6: check realism and balance
Contracting officers analyse price to decide whether it is fair and reasonable (FAR 15.404-1 (opens in a new tab)). They compare offers with each other, with past prices and with the government's own estimate. In some solicitations they also check realism: whether a price is so low that the offeror does not understand the work or cannot perform it.
- Unrealistically low labour rates or hours can be rejected or scored as high risk, especially in a best value evaluation.
- Unbalanced pricing, such as a very low base year and inflated option years, can be a reason to reject an offer.
- Missing line items can make a bid nonresponsive. Price every contract line item (CLIN) the schedule asks for, in the format requested.
Step 7: do not buy in
"Buying in" means pricing below cost to win, hoping to make it up later. It rarely works in federal contracting. Fixed prices hold for years of options, scope changes need formal modifications, and a losing contract can hurt your past performance record if you struggle to deliver. Win on a price you can sustain.
A few rules to know
- Certified cost or pricing data is generally required only for negotiated contracts above $2.5 million when there is no adequate price competition or other exception (FAR 15.403-4 (opens in a new tab)). Most first bids will not need it.
- Micro-purchases up to $15,000 (lower for some construction and services) can be bought without competition, often by government purchase card (FAR 2.101 (opens in a new tab)). Being easy to pay by card helps with very small orders.
- Price must match the format. If the solicitation gives a pricing sheet, use it exactly.
A pricing checklist
- Evaluation method understood: LPTA, tradeoff or sealed bid
- Contract type and every option year priced
- Cost build-up from the statement of work, with written assumptions
- Wage determination rates applied, plus fringe
- Bonds, insurance and required certifications costed
- Past award amounts checked for a sanity range
- Every CLIN priced in the required format
- A margin you would accept for the full term
Next steps
- Check that you can compete before you price: evaluating your eligibility for a federal bid.
- Avoid other first-bid errors in common bidding mistakes.
- Scan your website for free to find open notices that fit, then use our janitorial or construction guides for industry-specific pricing issues.